How to Bag Asbestos Safely: Know About Regulations

If you’re working in asbestos remediation or building maintenance, knowing how to bag asbestos safely is critical. In this article, we’ll walk through how to bag asbestos safely, covering what you need to know about regulations, equipment, containment, handling and disposal. You’ll walk away with a clear, practical plan for safe asbestos bagging, whether you’re supervising a crew or managing a site.

Why safe asbestos bagging matters

The health risk

All forms of asbestos are carcinogenic to humans. The World Health Organization (WHO) estimates more than 200,000 deaths annually from occupational asbestos exposure, over 70 % of all work-related cancer deaths.Moreover, the Occupational Safety and Health Administration (OSHA) states: “There is no safe level of asbestos exposure for any type of asbestos fiber.”
 

The regulatory framework

For professionals in the U.S., disposal bags must be sealed, labeled, impermeable bags or other closed, labeled, impermeable containers. Specifically, waste bags shall consist of 6 mil plastic double-bagged before filling (or thicker). 

The business risk

Improper waste packaging can lead to fibre release, site contamination, regulatory citations, worker exposure, and liability. So for building maintenance companies, abatement contractors or facility managers, doing it right both protects people and protects your operations.

Pre-Bagging Preparation

Step 1: Determine the regulated area

  • Identify the scope of asbestos-containing material (ACM) or presumed ACM (PACM) to be removed.
  • Establish a regulated work zone, barrier off adjacent areas, control access.

Step 2: Wetting & minimising dust

  • Wet the ACM before disturbance to suppress fibre release.
  • Avoid dry removal unless proven safe by a competent person and controls are in place.

Step 3: Provide and use proper PPE

  • Workers handling asbestos must wear suitable protective clothing, boots, gloves, respirators with HEPA filters.
  • Ensure decontamination pathways are in place (clean room, shower if required).

Step 4: Choose correct bagging materials

  • Bags must be impermeable and durable – the regulation does not mandate a specific mil thickness, but many states and guidance recommend minimum 6 mil thickness for plastic waste bags.
  • Use bags pre-labeled and marked with “Danger – Contains Asbestos Fibres – Cancer and Lung Disease Hazard.”

How to Bag Asbestos – Step by Step

Step 1: Double-bag or use thicker plastic

  • According to OSHA standard 29 CFR 1926.1101(g)(5)(iv)(B): waste must be double-bagged or plastic thicker than 6 mil.
  • If the first bag is punctured or shows signs of damage, discard it and replace.

Step 2: Keep material wetted until sealed

  • Maintain the wet condition of ACM until bagging is complete. According to Appendix F: waste must be bagged during or immediately after removal and remain saturated until the container is sealed.

Step 3: Seal and label the bag correctly

  • Seal with duct tape or equivalent to ensure no leaks.
  • Affix warning labels clearly visible.

Step 4: Transport and staging of sealed bags

  • Move sealed bags out of the regulated area via designated decontamination path.
  • Store bags in a secure, clearly designated storage area until final disposal.

Step 5: Disposal at approved facility

  • Dispose of the asbestos waste at an approved hazardous waste disposal site following local, state, national regulations. Cross-check regional rules (like lining trailers with plastic sheeting if transporting bulk waste).

Key Practical Tips & Best Practices

  • Minimize bag size: Use manageable bag sizes to avoid over-filling or damaging the bag.
  • Double-check the bag integrity: Before transporting any bag, inspect for tears, punctures, proper seal.
  • Avoid re-opening bags: Once sealed, bags should not be reopened, as this re-introduces risk.
  • Document and photograph: Keep records of date/time of removal, bagging, labeling, transport.
  • Worker training: Ensure all involved personnel are trained in safe work practices (engineering controls, PPE, containment, emergency procedures).
  • Plan for emergencies: Have a contingency plan for bag rupture, spills, leaks.
  • Integration with decontamination: Ensure workers leave the regulated zone through clean-up/shower etc so fibers don’t migrate outside.
  • Maintain negative pressure when needed: For large jobs involving enclosure, ventilation systems or negative pressure should be used.

Common Mistakes to Avoid

  • Using bags that are too thin and prone to tear.
  • Leaving material dry and unbagged for long periods—this increases airborne fibers.
  • Failing to label bags clearly (this could violate regulation and create risk).
  • Bagging in un-controlled areas or letting sealed bags sit in non-designated zones.
  • Not wetting material before and during removal.
  • Not using proper PPE or not training workers in the correct handling of sealed bags.

Why these steps make a difference

By bagging asbestos properly you:

  • Reduce fibre release: Proper containment and wetting lower risk of airborne fibres.
  • Comply with regulation: Meeting standards such as 29 CFR 1926.1101 means avoiding fines and legal exposure.
  • Protect workers and public: Improperly bagged asbestos can lead to contamination of site, adjacent areas, second-hand exposure to non-workers.
  • Maintain project reputation: Demonstrating professionalism in asbestos abatement or building maintenance builds trust with clients, regulators.
  • Manage long-latency health risks: Given asbestos-related diseases may appear decades later, proper bagging is part of long-term duty of care. Studies show that in 2019 globally there were approximately 239,330 deaths from occupational asbestos exposure and more than 4.189 million disability-adjusted life years (DALYs).

Conclusion

Bagging asbestos safely isn’t just another checklist item, it’s a critical control step in preventing a serious occupational health hazard. By using the correct bags, keeping material wet, sealing properly, labeling clearly and disposing at approved facilities, you protect your workers, your site and your reputation. Worried about one particular step or working with older buildings in Pakistan, the Middle East or elsewhere with less regulation? Planning ahead, training your team and following these best practices will make the job safer and smoother.

What’s your biggest concern when bagging asbestos on site, equipment, regulations, transport/disposal or worker training?

FAQs

Q1: Can I use regular plastic garbage bags for asbestos waste?
No. The regulations require impermeable, sealed containers. For example, OSHA’s construction standard states waste bags must be double-bagged or plastic thicker than 6 mil.

Q2: Does wetting the asbestos completely remove the hazard?
No. Wetting helps suppress dust and fibers, but proper bagging, sealing, labeling, and disposal are still needed. Asbestos exposure risk remains since there is no safe exposure level.

Q3: Where should I store sealed bags before disposal?
Store them in a secure, designated staging area, away from public access, clearly marked, and covered if necessary. If transporting bulk waste, follow local guidelines (e.g., line trailer with plastic sheeting).

Q4: Do bags have to be labeled?
Yes. Each bag must be conspicuously labeled with the caution: “Danger – Contains Asbestos Fibres, Avoid Creating Dust, Cancer and Lung Disease Hazard.”

Q5: How long can sealed asbestos bags remain on-site before disposal?
While no single global timeframe applies, best practice is prompt removal to reduce risk of damage or fibre migration. Check your local regulatory requirements for maximum storage durations.

Leave a Comment